Rapid raehabilitation MATISA type train, which worked on the romanian part of the IV Europeean railway corridor (Bucuresti Nord-Campina line). The mecanised refaction train MATISA P95 is designed for rapid track change works. The train is able to quickly remove the old line and sleepers and install new ones. The train has a lenght of 72 metres and a weight of 205 tons. It can travel with a maximum speed of 100 km/h. The sleeper crane is designed to take up to 30 sleepers from the sleeper carrying cars. It can place 24 sleepers/minute. Photo and scan by: Andrei Berinde (fbvro@xnet.ro)