The Railfaneurope.net Picture Gallery
Directory: /pix/pl/private/Newag/E4MSU

Last update: Wed Jul 6 21:10:29 CEST 2016
Pictures on this page: 7


Pictures:

E4MSU-001-2013_09_24-01.jpg (151220 bytes)

NEWAG Nowy Sacz
E4MSU-001
International Railway Fair in Gdansk
24.09.2013, Gdańsk Stadion EXPO

Photo W. Kolinski



E4MSU-001-2013_09_24-02.jpg (152155 bytes)

NEWAG Nowy Sacz
E4MSU-001
International Railway Fair in Gdansk
24.09.2013, Gdańsk Stadion EXPO

Photo W. Kolinski



E4MSU-001-2013_09_24-03.jpg (116889 bytes)

NEWAG Nowy Sacz
E4MSU-001
International Railway Fair in Gdansk
24.09.2013, Gdańsk Stadion EXPO

Photo W. Kolinski



E4MSU-001-2015_10_22-01.jpg (150975 bytes)

NEWAG Gliwice
E4MSU-01 with a freight train Gdansk Olszynka - Emilianow

22.10.2015, Pruszcz Gdanski

Photo W. Kolins



E4MSU-001-2015_10_22-02.jpg (153104 bytes)

NEWAG Gliwice
E4MSU-01 with a freight train Gdansk Olszynka - Emilianow

22.10.2015, track Rozyny - Skowarcz

Photo W. Kolins



ZNLE_E4MSU_1it12.jpg (149022 bytes)

ZNLE E4MSU GRIFFIN shown at InnoTrans 2012. Four axle locomotive equipped for DC 3 kV, AC 15 kV 16.7 Hz and AC 25 kV 50 Hz. 5.6 MW, 140 km/h, 88 t, length 19.9 m. On the same platform the locomotives E4DCU (3 kV, 140 km/h, 79 t), E4DCP (3 kV, 200 km/h, 79 t), E4ACU (15/25 kV, 140 km/h, 84 t), E4ACP (15/25 kV, 200 km/h, 84 t), E4MSP (3/15/25 kV, 200 km/h, 88 t) and a diesel electric variant D4MSU (2.3 MW, 140 km/h, 79 t) can be developed. InnoTrans, Berlin, september 2012.

tobias b köhler



ZNLE_E4MSU_2it12.jpg (152083 bytes)

ZNLE E4MSU GRIFFIN shown at InnoTrans 2012. Four axle locomotive equipped for DC 3 kV, AC 15 kV 16.7 Hz and AC 25 kV 50 Hz. 5.6 MW, 140 km/h, 88 t, length 19.9 m. InnoTrans, Berlin, september 2012.

tobias b köhler



Back