The Railfaneurope.net Picture Gallery
Directory: /pix/new/2023/03_mar06-ch2
Last update: Tue 23 Jul 16:28:28 BST 2024
|
transN BDe 4/4 5 Sophie (Reggiane/TIBB/SAAS 1950), operating on the 4 km long meter gauge line between Le Locle and Les Brenets.
Les Brenets, 2023-02-18. |
transN BDe 4/4 5 Sophie (Reggiane/TIBB/SAAS 1950), 1000 mm gauge, 1500 V =.
Les Brenets, 2023-02-18. |
transN BDe 4/4 5 Sophie (Reggiane/TIBB/SAAS 1950). Originally a series of
5 units built for CMN (Chemins de fer des montagnes neuchâteloises).
Les Brenets, 2023-02-18. |
transN BDe 4/4 5 Sophie (Reggiane/TIBB/SAAS 1950). Front view.
Les Brenets, 2023-02-18. |
transN BDe 4/4 5 Sophie (Reggiane/TIBB/SAAS 1950). Front view.
Les Brenets, 2023-02-18. |
transN BDe 4/4 5 Sophie (Reggiane/TIBB/SAAS 1950). Central buffer
coupling.
Les Brenets, 2023-02-18. |
transN BDe 4/4 5 Sophie (Reggiane/TIBB/SAAS 1950). Cab view.
Les Brenets, 2023-02-18. |
transN BDe 4/4 5 Sophie (Reggiane/TIBB/SAAS 1950).
Le Locle, 2023-02-18. |
transN BDe 4/4 5 Sophie (Reggiane/TIBB/SAAS 1950).
Le Locle, 2023-02-18. |
transN BDe 4/4 5 Sophie (Reggiane/TIBB/SAAS 1950).
In background the factory "Zodiac watches" towers over the station.
Le Locle, 2023-02-18. |
transN BDe 4/4 6 (Vevey/ABB 1991). 80 km/h, 1000 mm gauge, 1500 V =.
Train to Les Ponts de Martel.
La Chaux de Fonds, 2023-02-18. |
transN BDe 4/4 6 (Vevey/ABB 1991). Interior.
2023-02-18. |
transN BDe 4/4 6 (Vevey/ABB 1991). Cab interior.
2023-02-18. |
transN BDe 4/4 6 (Vevey/ABB 1991). Looking out of the front to
the maintenance hall at Les Ponts de Martel.
2023-02-18. |
transN BDe 4/4 6 (Vevey/ABB 1991). Ticket machine.
2023-02-18. |
transN BDe 4/4 6 (Vevey/ABB 1991). View out of the front near
La Chaux de Fonds where meter and standard gauge tracks run
parallel.
2023-02-18. |
transN BDe 4/4 6 (Vevey/ABB 1991).
Les Ponts de Martel, 2023-02-18. |
transN BDe 4/4 6 (Vevey/ABB 1991).
Les Ponts de Martel, 2023-02-18. |
transN BDe 4/4 6 (Vevey/ABB 1991).
Les Ponts de Martel, 2023-02-18. |
transN BDe 4/4 6 (Vevey/ABB 1991). Factory sign.
Les Ponts de Martel, 2023-02-18. |
transN flat wagon L 45 (still carrying the pre-1999 logo of
Chemins de fer des montagnes neuchâteloises).
Les Brenets, 2023-02-18. |
transN flat wagon L 45 (still carrying the pre-1999 logo of
Chemins de fer des montagnes neuchâteloises).
Les Brenets, 2023-02-18. |
transN snowplow X 103 (still carrying the pre-1999 logo of
Chemins de fer des montagnes neuchâteloises) and wagon
Kkb 38.
Les Ponts de Martel, 2023-02-18. |
transN snowplow X 103 (still carrying the pre-1999 logo of
Chemins de fer des montagnes neuchâteloises).
Les Ponts de Martel, 2023-02-18. |
Chemins de fer du Jura, standard gauge wagon
Fcs 40 85 6 452 902-7 CH-CJ on narrow gauge carrier
Ua 278.
Le Noirmont, 2023-02-18. |
Chemins de fer du Jura, standard gauge shunter Tm 98 85 0 232 181-9 CH-CJ
(SLM/MAN 1971).
Glovelier, 2023-02-18. |
Chemins de fer du Jura, standard gauge shunter Tm 98 85 0 232 181-9 CH-CJ
(SLM/MAN 1971).
Glovelier, 2023-02-18. |
Basel Land Transport Tango, interior.
Basel, 2023-02-18. |
Basel Land Transport Tango, interior.
Basel, 2023-02-18. |
Basel Land Transport Tango, line 10 to Rodersdorf.
Basel Peter Merian, 2023-02-18. |