Frecciargento 9419 Venezia SL - Napoli C. ETR 600 set 6-A. Built from 2007, the ETR 600 is equipped for 25 kV 50 Hz and 3 kV DC systems, reaching 250 km/h, with hydraulic tilting up to 8°. It looks like this is already the second Frecciargento livery (introduced 2011).

Venezia Mestre, 2013-10-20.

tobias b köhler