French sector of Portbou Station, with UIC-gauge tracks (1435mm-4ft8in), looking towards the "Tunnel Borgne" ("One-eyed Tunnel"), where the French tracks terminate.
Actually, the French sector used to have a third track, left of the two remaining tracks. It was lifted in the mid-90s. The former trackbed (still in evidence) has been obturated to extend the platform.
19th December 2003 P.L.Guillemin (plguillemin@yahoo.fr)