On 22 April 2006, the parts of the tunneling machine "Tosca", which will drill the eastern tube of the new underground line, were lifted into the starting pit at the station Bonner Wall. This is the cutting wheel, still loaded on the low-loading truck which brought it from the port at Godorf. In the background the two cranes at the pit are visible.

Digital photo by Christoph Schmitz (christoph.schmitz2@post.rwth-aachen.de)