The ramp of the narrow gauge line running from the freight station Köln Bonntor through the superstore site into the tunnel of the new underground line, seen on 22 April 2006. In the dark, the tracks turn to the left, towards the starting pit (which will become the station Bonner Wall later), while the ramp towards the station Marktstraße (where the trams will leave the underground) is on the right. This line, with a gauge of about 900 mm, will be used to bring the concrete segments for the lining of the tunnel to the tunneling machines. The excavated ground will be transported through pipes (mixed with bentonite supension) to the seperation plant at the station Bonntor. The startup of the new underground line is planned for 2010.