The Railfaneurope.net Picture Gallery
Directory: /pix/de/station/Horrem/2002

Last update: Sat Nov 15 16:11:02 CET 2014
Pictures on this page: 29


Pictures:

horrem24.jpg (145051 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen from the bridge at the eastern end on 1 February 2002. In the background the two highspeed tracks are finished, but here the connection between the old mainline and the line to Bergheim is still in this area. However, the catenary for the new tracks is already assembled. On the right is a part of the new track 8, connecting the building site east of the station with the old tracks.

Digital photo by Christoph Schmitz



horrem25.jpg (148278 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen on 1 February 2002. Behind track 6 is the new platform with the staircase in the center and the opening for the elevator on the left. Track 7 is covered by the platform, between it and the end of the pedestrian tunnel is the space for track 8. The bridge in the background will carry the northwestern leg of the track triangle. At the top a part of the temporary pedestrian bridge is visible.

Digital photo by Christoph Schmitz



horrem26.jpg (150895 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen on 1 February 2002. This is the northwestern leg of the track triangle. When it will be rebuilt, it will allow direct connections from Düren to Bergheim, but i think they will not be served in regular traffic. Currently the track ends at the buffer stop on the right. There had been a second track behind the platform, but it was given up. A new platform will be built in front of the track. The new bridge also forms an access for cars to the inside of the track triangle, where a parking place will be built.

Digital photo by Christoph Schmitz



horrem27.jpg (152178 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen on 1 February 2002. On the right is the entrance of the new pedestrian tunnel. Between it and track 7 is still space for track 8, which is not yet built. At the platform for track 6 the staircase on the left and the opening for the elevator on the right are visible.

Digital photo by Christoph Schmitz



horrem28.jpg (138079 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen on 1 February 2002. This is the end of the platform track for the trains coming from Bergheim. As they come in as train movements, the buffer stop is equipped with an Sh2. The new bridge will carry a connection to the mainline, but as far as i know this will not be used in regular traffic. In the background is RE 10725 (Düren-Münster), pushed by a class 111 with a red stripe (this is quite rare).

Digital photo by Christoph Schmitz



horrem32.jpg (149260 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards east from the temporary pedestrian bridge on 26 March 2002. The new part of the station with the highspeed tracks in the middle is in use. The area on the right, where the old line was, is prepared for the two tracks for the S-Bahn (urban trains).

Digital photo by Christoph Schmitz



horrem33.jpg (148853 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards south from the temporary pedestrian bridge on 26 March 2002. In the middle of the picture are the highspeed tracks between the two platform tracks. In front of the building, where the old line was, the ground is broken up to finish the new pedestrian tunnel that is already present under the new tracks. Then the tracks for the S-Bahn (urban trains) will be built in this area.

Digital photo by Christoph Schmitz



horrem34.jpg (115529 bytes)

The western end of the station at Horrem on the upgraded line Cologne-Düren (ABS 4) seen from the platform of track 6 on 26 March 2002. The end of the platform is not yet finished. The "10" at the signal means that the train can pass the switches leading into the highspeed track with 100 km/h.

Digital photo by Christoph Schmitz



horrem35.jpg (150338 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards east from the temporary pedestrian bridge on 21 April 2002. In the area where the old main line was located, the platforms for the S-Bahn (urban trains) will be built. Note the shape of the platform edges, I think this shall keep people away from crossing the tracks.

Digital photo by Christoph Schmitz



horrem36.jpg (134726 bytes)

The eastern end of the station at Horrem on the upgraded line Cologne-Düren (ABS 4) seen from the platform of track 3 on 21 April 2002. Track 3 is still connected to track 4 with a temporary switch, so the signal "32 ZS3" gives a speed limit of 40 km/h.

Digital photo by Christoph Schmitz



horrem37.jpg (145869 bytes)

The upgraded line Cologne-Düren (ABS 4) with the eastern exit of Horrem in the foreground seen looking towards east on 20 May 2002. On the left are the highspeed tracks with the entrance to track 7 and 8 at the edge of the picture. Three tracks will be built in the area on the right. Next to the highspeed tracks, track 3 (already present as a short platform track in the station) will be extended as a siding for freight trains. The switches and the exit signal can be seen in the background. The two tracks for the S-Bahn (urban trains) will be connected to the tracks visible behind the signal.

Digital photo by Christoph Schmitz



horrem38.jpg (119797 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards east on 30 May 2002. Between these platform edges the two tracks for the S-Bahn (urban trains) will be built. The left platform is already used for track 3 on the other side. In the background is a new gantry with the two exit (or intermediate?) signals.

Digital photo by Christoph Schmitz



horrem39.jpg (143978 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards east on 30 May 2002. Track 3 on the left will be continued as a siding for freight trains. On the right the two tracks for the S-Bahn (urban trains) will be built. A new gantry with two signal is already there.

Digital photo by Christoph Schmitz



horrem40.jpg (104391 bytes)

The station at Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards west from the pedestrian bridge on 15 June 2002. The bridge in the picture will carry track 10 and it's platform (on this side of the track). By now track 10 is cut off on the right, the platform is at the other side. The street under the bridge will be the access to the new parking place inside the station.

Digital photo by Christoph Schmitz



horrem41.jpg (149752 bytes)

The station at Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards west from the pedestrian bridge on 15 June 2002. The southern part of the pedestrian tunnel is under construction. Above it track 1 and 2 for the S-Bahn (urban trains) will be built.

Digital photo by Christoph Schmitz



horrem42.jpg (146821 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards west from the pedestrian bridge on 25 July 2002. The new pedestrian tunnel is just being covered with sand. In the middle of the picture the tracks 1 and 2 for the S-Bahn (urban trains) will be built. Two staircases and two elevators are visible in this area. On the left they will lead to the platform of track 1 next to the station building, on the right they will connect the tunnel with the platform between track 2 and 3.

Digital photo by Christoph Schmitz



horrem43.jpg (147976 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards east from the platform of track 3 on 31 July 2002. By now track 3 joins track 4 at a temporary switch, later it will use the switch behind that. The eastern extension of track 3 (intended as a siding for freight trains) is under construction. A switch will be inserted into track 3 allowing either to go to track 4 or into the siding. On the right are the first parts of track 2, the northern track for the S-Bahn (urban trains), a switch connecting it to track 1 is visible. There is also a connection to track 3 more in the background, but it might be temporary.

Digital photo by Christoph Schmitz



horrem44.jpg (133925 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards east from the platform of track 3 on 18 August 2002. The connection to the eastern part of the track (without platform) and to track 4 is now finished. The exit route for the passenger train that will arrive soon is leading through the eastern part, as there where works going on in track 4.

Digital photo by Christoph Schmitz



horrem45.jpg (121624 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards west from the pedestrian bridge on 18 August 2002. On the right is the bridge that will carry track 10 and it's platform (on this side). The stairs forming the access to the platform are under construction. At the left edge is the entrance of the pedestrian tunnel that will lead to the tracks 1, 2, 3 and 6 and the station building.

Digital photo by Christoph Schmitz



horrem46.jpg (135373 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards south from a point near track 10 on 2 September 2002. This is the northern entrance of the new pedestrian tunnel. On the right the stairs towards the new platform of track 10 is under construction.

Digital photo by Christoph Schmitz



horrem47.jpg (126084 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen on 2 September 2002. This new bridge will carry track 10 on the right and it's platform on the left.

Digital photo by Christoph Schmitz



horrem48.jpg (137978 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards south from the pedestrian bridge on 2 September 2002. The handlebars are in place at the three staircases of the new tunnel. Between the platform edges of track 2 and track 3 sand is filled in to carry the surface of the platform.

Digital photo by Christoph Schmitz



horrem49.jpg (147461 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards east from the pedestrian bridge on 2 September 2002. The tracks 1 and 2 for the S-Bahn (urban trains) are under construction in the platform area. There are connections between track 1 and 2 and between 2 and 3.

Digital photo by Christoph Schmitz



horrem50.jpg (112232 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards east on 10 September 2002. The tracks 1 and 2 for the S-Bahn (urban trains) are under construction in the platform area. Very interesting is the signal ZS3 on the left. It announces the signal P3 far in the background, marked with a red circle in the picture. As P3 shows Hp0 (stop), ZS3 shows Ks2 (expect stop) together with a white light which informs about the reduced distance. The "4" says that there is a speed restriction of 40 km/h. When P3 turns green, this will change to an "8" for 80 km/h, the same speed restriction that will be given at P3 then.

Digital photo by Christoph Schmitz



horrem51.jpg (107816 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards west from the pedestrian bridge on 6 October 2002. The stairs leading to track 10 are finished, but the platform (and the track) on the bridge is still missing. Two sockets for ticket machines were installed at the bottom. On the left is the entrance of the pedestrian tunnel that will lead to the tracks 1, 2, 3 and 6 and the station building. Next to the platform-less track 7 (visible in the upper left corner) seems to be space for another track above the tunnel.

Digital photo by Christoph Schmitz



horrem52.jpg (147620 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards south from the pedestrian bridge on 6 October 2002. The three elevators to the platforms of track 1 (at the building), track 2 and 3 (in the middle) and track 6 (in the foreground) are under construction.

Digital photo by Christoph Schmitz



horrem53.jpg (131186 bytes)

The station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards west from the pedestrian bridge on 6 October 2002. The tracks 1 and 2 for the S-Bahn (urban trains) are under construction on the left. On the right are track 3 (platform track), track 4 and 5 (highspeed tracks) and the exit of the tracks further north. The turning track for the S-Bahn next to track 2 is still connected to track 3 at this time.

Digital photo by Christoph Schmitz



horrem55.jpg (93135 bytes)

The new pedestrian tunnel at the station of Horrem on the upgraded line Cologne-Düren (ABS 4) seen looking towards south on 9 November 2002. The picture was taken from the point where the staircase to track 6 is. On the left the staircase to track 2 and 3 is visible. The staircase to track 1 at the end of the tunnel is on the right. Construction works are still going on, mainly on the three elevators which are placed facing the stairs.

Digital photo by Christoph Schmitz



schild_ho1.jpg (74508 bytes)

This sign at the catenary marks the border of the working area at a new track. Some meters further on are the insulators that seperate the working area (with no voltage) from the area with high voltage. Seen at Horrem (on Cologne-Aachen) on 1 February 2002.

Digital photo by Christoph Schmitz



Back