The station of Buir on the upgraded line Cologne-Düren (ABS 4) seen looking towards east on 26 July 2002. While the part of the new tunnel under the highspeed tracks on the left is already finished, work is still going on at the part under the area for the S-Bahn (urban trains). On the right the tunnel continues some meters where no tracks will be built, maybe a pedestrain way will run next to the rails crossing the street. On the left the eastern end of the northern platform is under construction. The walls for the elevator are visible, the staircase is not in the picture.

Digital photo by Christoph Schmitz