504 of RWE Power (formerly Rheinbraun) slowly pulls it's coal train through the loading facility at the opencast mine Garzweiler (north west of Cologne) on 22 July 2007. There are two loading units, each spanning two tracks to allow continuous loading. The right unit, which spans the two foremost tracks and is used for overburden, was not operating on that Sunday. The catenary, which passes under the loading facility, is suspended laterally. Thus the main pantographs of the loco are down and it is powered by the small tilted pantograph which can be seen just below the stair of the facility.

Digital photo by Christoph Schmitz (christoph.schmitz2@post.rwth-aachen.de)