Catenary works near Düren (on Cologne-Aachen) on 23 February 2003. The track was removed and built up new for a better alignment, so the brackets had to be replaced by longer ones. The upper arm of the new bracket is being attached to the mast at the lower point. In the background is the ballast train.
Digital photo by Christoph Schmitz