Catenary works near Düren (on Cologne-Aachen) on 23 February 2003. The track was removed and built up new for a better alignment, so the brackets had to be replaced by longer ones. The lower arm (with the side clip) was just detached and will be brought down now. The train visible below spreads ballast onto the new track.
Digital photo by Christoph Schmitz