The Railfaneurope.net Picture Gallery
Directory: /pix/de/misc/bridge/Buir

Last update: Sat Nov 15 18:24:26 CET 2014
Pictures on this page: 12


Pictures:

bridge_bu1.jpg (114657 bytes)

The bridge of the upgraded line Cologne-Düren which crosses the Hohlweg east of Buir seen from the south side on 30 September 2006. As the S-Bahn (suburban railway) line is currently extended from one to two tracks, also the bridge has to be extended.

Digital photo by Christoph Schmitz (christoph.schmitz2@post.rwth-aachen.de)



fw1_bu1.jpg (109212 bytes)

The first narrow bridge crossing the upgraded line Cologne-Düren (ABS 4) west of Buir seen from the north side on 23 August 2001. The old bridge which crossed two tracks was removed long ago, now a new bridge is built that will cross all four tracks.

Digital photo by Christoph Schmitz



fw1_bu2.jpg (93832 bytes)

The first narrow bridge crossing the upgraded line Cologne-Düren (ABS 4) west of Buir seen from west on 23 August 2001. The old bridge which crossed the two old tracks on the right was removed long ago, now a new bridge is built that will also cross the two highspeed tracks which will be built on the left. Note that there is no pillar in the middle and the pillars are some meters away from the tracks, this should prevent that a derailed train destroys the bridge like it happened in Eschede.

Digital photo by Christoph Schmitz



fw2_bu1.jpg (101273 bytes)

The second narrow bridge crossing the upgraded line Cologne-Düren (ABS 4) west of Buir seen from west on 23 August 2001. The old bridge which crosses the two old tracks is still in place, a temporary gangway for pedestrians and bicycles crosses the building site for the highspeed tracks. In the background a new bridge which will cross all four tracks is built.

Digital photo by Christoph Schmitz



fw2_bu2.jpg (112116 bytes)

The second narrow bridge crossing the upgraded line Cologne-Düren (ABS 4) west of Buir seen from the south side on 23 August 2001. On the left is the old bridge. It's connection to the north side was removed to make the building site for the highspeed tracks free. The temporary gangway for pedestrians and bicycles which connects the bridge to the north side now is nearly invisible from this point. On the right a new bridge which will cross all four tracks is built.

Digital photo by Christoph Schmitz



fw2_bu3.jpg (131070 bytes)

The second narrow bridge crossing the upgraded line Cologne-Düren (ABS 4) west of Buir seen from east on 23 August 2001. A new bridge which will cross all four tracks is built. The old bridge which crosses the two old tracks is behind it. Note that at the new bridge there is no pillar in the middle and the pillars are some meters away from the tracks, this should prevent that a derailed train destroys the bridge like it happened in Eschede.

Digital photo by Christoph Schmitz



fw2_bu4.jpg (112623 bytes)

The second narrow bridge crossing the upgraded line Cologne-Düren (ABS 4) west of Buir seen from west on 20 April 2002. The old bridge crossing only the two old tracks is still in place, I guess it will be broken down when the tracks are out of service for some months. Behind it is the new bridge crossing all four tracks.

Digital photo by Christoph Schmitz



fw3_me1.jpg (124882 bytes)

The third narrow bridge crossing the upgraded line Cologne-Düren (ABS 4) west of Buir seen from east on 23 August 2001. The old bridge which crossed the two old tracks was removed, the southern pillar is still visible. Beneath it some preparations for the new bridge which will also cross the two highspeed tracks are visible.

Digital photo by Christoph Schmitz



fw3_me2.jpg (148570 bytes)

The third narrow bridge crossing the upgraded line Cologne-Düren (ABS 4) west of Buir seen from west on 20 April 2002. On the right is the southern pillar of the old bridge, which crossed only the two old tracks. The new bridge is not yet opened for public use, among other things the handlebars are still missing.

Digital photo by Christoph Schmitz



pers_bu.jpg (126563 bytes)

Some security personel at a bridge building site of the upgraded line Cologne-Düren (ABS 4) west of Buir seen on 23 August 2001.

Digital photo by Christoph Schmitz



tunnel_bu1.jpg (132518 bytes)

The new street tunnel in Buir on the upgraded line Cologne-Düren (ABS 4) seen from west on 23 August 2001. The new highspeed tracks above the tunnel are under construction. When they are in service, the old tracks on the right can be removed to continue the tunnel. Then the old tracks will be rebuilt for the S-Bahn (urban trains). The level crossing in the background will then be removed, too.

Digital photo by Christoph Schmitz



tunnel_bu2.jpg (144825 bytes)

The new tunnel in Buir on the upgraded line Cologne-Düren (ABS 4) seen from west on 8 December 2001. The highspeed tracks on it seem to be more or less finished, also the catenary of the northern track is already present. When the old tracks on the right are out of service, the tunnel can be continued. After this the old level crossing in the background will be removed.

Digital photo by Christoph Schmitz



Back