A new crane has been erected on the south bank of the Elbe. The bridge pillars are being rebuilt for the new 5-track bridge, while trains are still using two tracks of the old bridge. A four-car S1 train is crossing the bridge in the soft afternoon light. 2001-10-30.

photo: tobias b köhler