The Railfaneurope.net Picture Gallery
Directory: /pix/ch/funicular/Lugano-S_Salvatore
Last update: Sun Nov 16 02:13:11 CET 2014
|
Monte San Salvatore, Lugano, 05-09-2004, michel.lavertu@wanadoo.fr |
Monte San Salvatore, Lugano, 05-09-2004, michel.lavertu@wanadoo.fr |
Monte San Salvatore, Lugano, 05-09-2004, michel.lavertu@wanadoo.fr |
Inside Monte S.Salvatore funicular.
Photo by Emanuele Rava, 18-3-2011 e-mail emanrava@yahoo.it |
Inside Monte S.Salvatore funicular.
Photo by Emanuele Rava, 18-3-2011 e-mail emanrava@yahoo.it |
Intermediate station of Monte S.Salvatore funicular.
Photo by Emanuele Rava, 18-3-2011 e-mail emanrava@yahoo.it |
Intermediate station of Monte S.Salvatore funicular.
Photo by Emanuele Rava, 18-3-2011 e-mail emanrava@yahoo.it |
Intermediate station of Monte S.Salvatore funicular.
Photo by Emanuele Rava, 18-3-2011 e-mail emanrava@yahoo.it |
Terminal station of Monte S.Salvatore funicular.
Photo by Emanuele Rava, 18-3-2011 e-mail emanrava@yahoo.it |
Funicolare San Salvatore
The bottom station of the San Salvatore funicular, in Paradiso, Ticino. This goes halfway up before having to change to another funicular that has a much steeper grade. In summer, the service is much more extensive than in fall, winter or spring. Taken 3 August 2004 © 2004, 2006 Josh Hanz (josh_hanz@hotmail.com) |
Funicolare San Salvatore
The bottom station of the San Salvatore funicular, in Paradiso, Ticino. This goes halfway up before having to change to another funicular that has a much steeper grade. In summer, the service is much more extensive than in fall, winter or spring. Taken 3 August 2004 © 2004, 2006 Josh Hanz (josh_hanz@hotmail.com) |
Funicolare San Salvatore
This is the schedule, without any guarantees (I learned this the "hard" way) that each departure will even take place. Sometimes there might be a glitch in the control software that controls the ascent and descent, and will have to be corrected until the next train can arrive. Taken 3 August 2004 As the sign shows, the schedule is valid from 11 June to 11 September 2004. © 2004, 2006 Josh Hanz (josh_hanz@hotmail.com) |
Funicolare San Salvatore
This is inside of the lower half of the San Salvatore funicular (with the less-steep grade). Taken 3 August 2004 As the sign shows, the schedule is valid from 11 June to 11 September 2004. © 2004, 2006 Josh Hanz (josh_hanz@hotmail.com) |
Funicolare San Salvatore
At the top station of the San Salvatore funicular, in Paradiso, Ticino. This goes halfway up as seen on the right, before having to change to another funicular that has a much steeper grade, as seen on the left. This is only a partial-scale model, to conceptually show how the trajectories were constructed. Taken 3 August 2004 Please note, if you manage to visit the Melide Swiss-Miniatur Museum, you should be able to find a smaller scale model, actually moving up or down. Such will not qualify as a valid picture, but in my opinion it is worth a mention. © 2004, 2006 Josh Hanz (josh_hanz@hotmail.com) |
Funicolare San Salvatore
This is inside of the lower half of the San Salvatore funicular (with the less-steep grade). Taken 15 September 2000 This is a night picture. If I remember correctly, the next night was the last night that the funicular operated after 9 PM daily. © 2000, 2006 Josh Hanz (josh_hanz@hotmail.com) |
Panoramic car of Funicolare San Salvatore (FA)-Lugano. digital photo marcolambruschi@libero.it |