SPL (Siemens Powerlines) KL X 934 009-2 (Montageturmwagen). This small vehicle with a work platform and a measurement pantograph weighs 3.2 t, and has an own drive so that it can go up to 20 km/h on building sites. It cannot be part of a train though, as it has no regular coupler. Photographed on a siding at Graz-Puntigam. 2003-03-14.

photo: tobias b köhler